- cross-posted to:
- technology@lemmy.world
- climate@slrpnk.net
- cross-posted to:
- technology@lemmy.world
- climate@slrpnk.net
First planned small nuclear reactor plant in the US has been canceled::NuScale and its primary partner give up on its first installation.
Yes and so do the batteries and all the controls.
There’s not necessarily a need for batteries. I’m generating energy and use it up directly, and inject the overage back into the grid against a compensation, and then at night or during times of heavy cloud coverage, I draw power from the grid pretty much on par with the money I received. So far it’s a zero sum game or slightly profitable.
Ok cool. So you outsourced the battery needs to someone else. Good job. Hey I figured out how to fix global warming, all we need to do is move all the stuff that causes it to different countries.
Didn’t address the controls I noticed.
Please read up on how power grids work, before returning to this conversation. Thanks.
Got a point go ahead and make it.
What he means is it’s not getting stored in a battery